Miminmum requirements for the ledgers lag screws left they must be installed with washers.
Proper floor joist laps connections.
Floor joists tied overwood beam girder or partition table nailing schedule 2304 9 1 1 inch by 4 inch left in ribbon strip recommend attachment with two 8d common recommended face nail each joist lapped with adjacent stud with three 16d common or box nails similar to item 17 table 2304 9 1 joists bearing on concrete or masonry.
The damaged members would have to extend beyond the damaged portion of the existing or are you saying go from support to support.
The force used for driving the paf varies depending upon the steel thickness and strength.
The new members would have to be at the top of the damaged member.
Toenailing does not constitute a proper connection.
So if i look at installing a 2x4 or 2x6 on each side of the damaged 2x8 floor joist.
Enhance the connections for easier field installation can go a long way in creating the best connection solution for the joists and deck in any given project.
Beams should be supported by at least 1 in.
Watch this video to.
Of solid wood over posts.
Splices in beams should be supported by a post or structural column of some sort.
The rim needs to be solid with no rot and constructed using proper building practices such as glued and nailed floor ply plate sill and joist connections.
Issues such as wobbly railings loose stairs and ledgers that appear to be pulling away from the.
The post or column should rest on a foot ing that meets local building code requirements.
Joists framing from opposite sides over a bearing support shall lap a minimum of 3 inches i never lost a cent on the jobs i didn t get.
The further cantilevered out the joists go just adds more possibility that any joist sag will hump that floating joist end up.
As long as they don t overlap the far edge of the bearing point by 12 5 you should be fine.
Unlike the other types of fasteners these cannot be used for side lap connections.
The connection design would be similar to reinforcing a steel beam.
And the beams should be connected to the post with an approved metal connector.
Connectors must be installed with the correct fastener.
Welding let s start with welding which is one of the more is not.
Drill a 1 2 hole in the ledger and a 5 16 pilot in the rim.
Following the manufacturer s instructions ensures proper driving by using the correct power setting testing and checking the fastener by making a few trial fastenings before proceeding.